Local Chinese industrial flooring manufacturer FLDC completes a 7-day shutdown floor renovation for a Hubei pharmaceutical factory. Epoxy self-leveling system with 4-layer structure delivers GMP-compliant, seamless, chemical-resistant and heavy-load flooring with turnkey delivery.
—— Local manufacturer, labor and materials included, new floor delivered within 7 days of shutdown
When pharmaceutical enterprises face the dual pressure of “GMP cleanliness upgrading and old floor sanding and cracking”, an efficient, compliant and worry-free renovation path becomes a rigid demand. The old epoxy flat coating floor of a pharmaceutical enterprise in Hubei had been in service for many years, showing peeling, micro-cracks and fading, and urgently needed a dual upgrade of “appearance and performance”. Hubei FLDC Coatings provides a full-package service of “investigation – customization – labor and materials included – whole plant delivery”, completing the renovation of the worn-out floor within only a 7-day shutdown window.
1. Pain Points of the Worn-Out Floor

- The epoxy flat coating is aged, with local peeling and micro-cracks, easily accumulating dust;
- The surface is matte and dull, giving an outdated overall impression;
- After frequent cleaning with solvents and disinfectants, stubborn stains and color differences remain.
2. FLDC One-Stop Renovation Solution
2.1 Rapid On-Site Investigation
Substrate humidity, crack distribution and old coating adhesion are all quantitatively recorded, providing an accurate basis for subsequent material selection and process design.
2.2 Customized Coating System (4 Layers)
- Penetrating reinforcing primer: Solves the powdered substrate of the old epoxy flat coating, strengthens base adhesion and fundamentally eliminates the risk of delamination;
- Lightweight self-leveling mortar intermediate coat: Levels cracks, pits and uneven areas at one time, building a solid and flat bearing layer;
- Epoxy self-leveling topcoat: High-gloss mirror finish, seamless and dust-proof, resistant to alcohol and quaternary ammonium salt disinfectants, suitable for pharmaceutical clean workshops;
- Same-system color lines: Zoning markings with lasting bright colors, not easy to wear off.
2.3 Seven-Day Shutdown Construction Schedule
| Time | Construction Content |
| Day 1 | Remove the old epoxy flat coating |
| Day 2 | Grinding and dust removal + primer application |
| Day 3 | Self-leveling mortar construction |
| Day 4 | Fine repair + curing |
| Day 5 | Self-leveling topcoat troweling |
| Day 6 | Color line marking + overall inspection |
| Day 7 | Curing completion + third-party inspection + sign-off acceptance |
3. Delivery Highlights
- Mirror-like high gloss: Clear lamp reflection, instantly brightening the space;
- Seamless as a whole: Cleaning tools can reach every corner, saving time and effort in daily cleaning;
- Chemical and heavy-load resistance: No traces under high-frequency use of forklifts, trolleys and disinfectants.
| “Hand the worn-out epoxy flat coating over to FLDC and you get a high-gloss self-leveling floor in 7 days — one shutdown period, done once and for all.” |
Hubei FLDC Coatings provides: free on-site investigation | exclusive shutdown renovation scheme | turnkey delivery with labor and materials included. Contact Hubei FLDC Coatings — the next floor to be renewed could be yours.
